GENERAL INSTALLATION TOP DOWN
-
Center top tie bar flush with the top of the door frame and clamp in place.
-
Drill pilot hole with tech screws and drill 5/8 holes.
-
Bolt tie bar in place with 5/8 bolts with nuts outside.
-
Clamp top panel side rail snuggly below and secure with tech screws.
-
Center the middle tie bar below the rails, snug up and clamp in place.
-
Drill pilot holes and enlarge to 5/8".
-
Bolt in place with wing bolts and wing nuts.
-
Clamp auger side rails snuggly below and secure with tec screws.
-
Center bottom tie bar below the rails, sung up and clamp in place.
-
Drill pilot holes and enlarge to 5/8".
-
Bolt in place, nuts on the outside.
-
Install auger chute and adjust chute side rails to seal against chute sides.
-
Tech screw tabs on the middle bar nuts to the frame.
-
Fill the remainder of the opening with the old door panels and seal as required.
To install from bottom up just start at 12 and go to 1.
|